What happens next

Something happened. Here is the next few weeks.

Every other section of this site is organized by question. These six pages are organized by time, because a homeowner who has just had a result land, or just watched a crew drive away, does not have a question yet — they have a stretch of calendar they cannot picture.

Each stage says how long after the triggering event it happens, whose move it is, what to do if it does not happen, and — the part that actually took experience to learn — where people fall out of the sequence.

Pick the thing that just happened

After a radon test

The test is done, or the device is in the post, and nobody has told me what happens now.

Result in three days to two weeks, then a validity check, then either a retest or proposals — and the validity check is the step people skip.

5 stages

After mitigation

The crew has left. There is a pipe and a fan and a gauge, and I do not know what I am supposed to do with any of it.

Walkthrough on the day, confirmation test within about a month, paperwork filed, then a gauge you glance at and a measurement every couple of years.

5 stages

After buying a home

We closed. Radon either came up during the sale or it did not, and I want to know where I actually stand.

Test in the first month while the house is empty or newly occupied, establish a baseline for anything you inherited, then fold it into the ownership routine.

5 stages

After selling a home

We closed and radon was part of the negotiation. Is that finished, or does something come back to me?

Documentation obligations mostly end at closing; keep the file anyway, expect the possibility of a buyer retest, and know that a credit and completed work leave you in different positions.

5 stages

After replacing a fan

The fan was replaced. Do I need to test again, and what am I supposed to check?

Record the new gauge reading the same day, retest within about a month, file the new warranty, and set the next check so a second silent failure cannot happen.

5 stages

After a failed inspection

The inspection came back elevated and we are inside a contingency window. What happens over the next two weeks?

Validity and days-remaining in the first 48 hours, a written request inside the contingency, resolution in the following days, then an amendment that has to be specific enough to close on.

6 stages

Related

Get quotes from credentialed local contractors

Free to request and no obligation. We verify credentials with the issuing authority before any request routes to a contractor.

Start a request